Left engine compartment
Right engine compartment
650 P left & right engine compartments with access to engine oil dipstick, fill, and filter
650 P right service door with access to vertical spin on fuel, hydraulic, and hydrostatic transmission filters and fill
650 P left service door with access to electrical system and DEF tank with service light switch
Efficient and cleanly routed harnesses and hoses to minimize rub and leak points under the cab floor plate
John Deere small dozers host many improvements made to simplify maintenance and improve uptime, building upon the durability that customers have come to appreciate with their John Deere Dozers. Maintenance items are conveniently located for easy access using vertical spin-on type filters. Hose and harness routings have been optimized to reduce rub and leak points, ensuring your machine stays up and running longer. The color-coded periodic maintenance chart includes relevant information such as maintenance intervals, refill capacities, and fluid recommendations to help ensure maintenance gets done correctly and on-schedule.
Benefits
- Reduced maintenance costs with extended hydraulic oil change interval of 4,000 hours (from 2,000 hrs.) throughout John Deere’s small dozer lineup
- Reduced likelihood of fluid leaks and hose failures due to the optimized harness and hose routings throughout the machine
- Ground level filter access, using vertical spin-on style filters makes maintenance straightforward
John Deere dozers provide customers a periodic maintenance chart located on the inside of the right service door